We Continue the Work of Those
Who Were the First.

  • Electrotechnics
  • Electrical Engineering
  • Light & Lighting
  • Power Engineering
  • Transportation
  • Automation
  • Communication
  • Smart Buildings
  • Industry
  • Innovation

Current issue

ELEKTRO 7/2019 was released on June 26th 2019. Its digital version will be available on July 26th 2019.

Topic: Cables, conductors and cable engineering, Tools, equipment and accessories for work with cables

Main Article
Asset management and diagnostic needs in Industry 4.0

SVĚTLO (Light) 3/2019 was released on June 11th 2019. Its digital version will be available on July 15th 2019.

Fairs and exhibitions
Euroluce 2019 by designers eyes
Exhibition Light in architecture 2019
Amper 2019 in capture of sophisticated technologies

Refreshing our memory
Lighting glass from Kamenný pahorek

Musk's record-breaking battery officially launches in Australia

01.12.2017 | Tech Xplore | www.techxplore.com

The world's biggest battery was officially launched in Australia on Friday, a day after the Elon Musk-driven project was powered up early to meet demand amid a bout of hot weather, officials said.

Musk's Tesla built the Powerpack system, which can provide electricity for more than 30,000 homes, to ease South Australia's energy woes after the state was hit with a total blackout in 2016 following an “unprecedented” storm.

Elon Musk battery

The maverick billionaire earlier this year offered on Twitter to build the battery farm, and completed it last week to narrowly beat his self-imposed deadline of having it ready in 100 days.

The 100 MW/129 MWh battery, located in the rural town of Jamestown north of Adelaide and connected to a wind farm operated by French energy firm Neoen, was switched on a day early, just as temperatures soar in the state.

Read more at Tech Xplore

Image Credit: Tesla

-jk-